Quick Details
Serial No. |
Parameter |
Description |
1 |
Safewire item |
HTD-127ZAP |
2 |
Panel Material |
Brass alloy/Stainless steel |
3 |
Surface finish |
Wire drawing / Polishing / Spray painting |
4 |
Panel Dimension(mm) |
127*127 |
5 |
Cutout(mm) |
122*122 |
6 |
Capacity of modules |
3 ways modules |
7 |
Horizontal mounting |
Horizontal installation |
8 |
Sink box Material |
Steel+Zinc plated |
9 |
Available modules |
45*45/22.5*45(mm) |
Application:
- Office and education
- Industry and Engineering
- Presentation and retail;
- Orientation and safety;
- Transit areas and parking;
- Hotels, hospitality and wellness;
- Health, sport and leisure;
- Art and culture;
Installation instructions:
- Remove the panel from the bottom box along with the electrical modules.
- Fix the flooring with spare screws on the bottom box and place it in the embedded hole.
- The flooring surface shall be at least level with the ground or 20mm below the ground.
- Remove flooring surface ,Insert the 10--12mm lead head into the terminal of floor box.
- Fix the panel to the bottom box with screws.
Attentions:
1.Dispose of trash in bottom box and prevent dirt and debris from entering inside.
2.The sealing ring is closely attached to the smooth surface to prevent water leakage.
3.Prevent from alkaline corrosion and humidity.
4.When installing, pay attention to the opening direction,the length of the conductor to the bottom box shall not exceed 10cm,Set aside at least 200mm of cable.
5.When installing and wiring,Product should avoid direct contact with corrosive liquid, gas (strong acid, strong alkali, paint).
6.This product is suitable for dry surface treatment, avoid water flush and immersion, and ensure its insulation
7.Avoid acid alkaline solution flushing,avoid scratch of transparent protective paint,ensure corrosion resistance.
Package:8pcs inner box into a master carton.Poly bag with box packing.
HTD-127ZAP Outline drawing: